A federal judge has ordered the US Army to pause its plans to detonate five tons of lead azide on Monday after environmental activists filed a lawsuit expressing concerns about the potential impacts of the explosion.

Officials at the Iowa Army Ammunition Plant, in coordination with the US Environmental Protection Agency, planned to destroy 68 drums of lead azide, a material used to detonate munitions, the Army said.

The detonation in the southeastern town of Middletown was initially scheduled for Friday but was postponed to Monday after pushback from the public and elected officials.

“I have heard from many Iowans who are worried about their health and safety due to the potential risk of lead exposure as a result of the detonation,” Senator-elect Josh Turek said Thursday in calling for a delay.

  • CmdrShepard49@sh.itjust.works
    link
    fedilink
    arrow-up
    1
    ·
    24 hours ago

    Im not sure how you’d place that over the barrels without disturbing them as most construction equipment capable of that is very large and heavy and sends vibrations a long way through the ground.

    • queermunist she/her@lemmy.ml
      link
      fedilink
      arrow-up
      1
      ·
      24 hours ago

      There are techniques used for restoring historic landmarks that can compensate for this.

      Either we try or the corn belt is dusted with lead and we go back to the bad old days of everyone having lead in their brain.