11·
2 days agoAgain, that’s over their entire, very long lifetime. The costs are high up front for construction and commissioning.

Again, that’s over their entire, very long lifetime. The costs are high up front for construction and commissioning.

They’re insanely expensive up front, it’s just that they’re relatively cheap to run and last a long time so the costs have a low average over time.


And also a struggling economy.


Now I’m thinking about making badges that say “Assigned Child At Birth”.
$2/kWh doesn’t even make sense as a measurement for upfront costs.